We provide interior acoustics, noise and vibration
various solutions
Acoustic design scheme

Publisher: Guangzhou Chuangya Acoustics Technology Co., Ltd.   Time: 8/11/2003

design
scheme

Acoustic project overall solution design scheme

Disadvantages brought by
multi-party docking

You may encounter the following troubles

  • Designer -
    Design company

    General design companies do not fully understand acoustic knowledge.

  • Material supplier -
    Raw material factory

    1. The purchased materials are inconsistent with the materials in the design drawing.
    2. Easily earned by agents and middlemen.

  • Constructor -
    Construction team

    1. Third party installation is not standardized, and the installation environment is dirty and disorderly.
    2. Do not know about materials, increase loss.

Why choose Us

One stop acoustic environment overall solution

  • Professional acoustic design

  • Excellent team

  • Efficient construction

  • Quality products

  • 3D effect display

  • Acoustic data analysis

Case presentation

Production strength
More confidence in purchasing

More designs

More convenient and worry free one-stop acoustic design scheme

Design Scheme Service Process

One stop service for design, product and construction

  • 01. Understand customer needs

    Understand customer needs (site area / style preferences).

  • 02. Plane layout planning

    Plan layout, and collect the design scheme deposit after confirmation.

  • 03. Scheme design customization

    The simulation software makes customized design renderings, and collects the final payment of the design scheme and the deposit of the construction design scheme after confirmation.

  • 04. Construction drawing design

    Preparation of construction drawings, docking of mechanical equipment, fire water and electricity and other disciplines, and collection of final payment and construction deposit for construction scheme design after completion.

  • 05. Follow up at construction site

    Follow up on site, make actual modifications and adjustments, and collect the construction balance after completion.

Estimated time of process

The delivery time and delivery method are transparent and clear, and the choice is more reassuring.

project Delivery time Delivery method
Plane layout planning 1~2 working days on-line
Scheme design customization 3~5 working days on-line
Construction drawing design 5~10 working days on-line
Site construction Depends on the progress scene

Choice of quality

Chuangya Acoustics · Acoustic Environment Overall Solution Service Provider.

  • Exclusive customer service

  • Ingenious craft

  • 10

    10 year warranty

contact us

Consulting hotline:4001-593-886
Address: 503~505, Huachang Center, Nanhai District, Foshan, Guangdong

  Guangzhou Chuangya Acoustics Technology Co., Ltd., founded in 2005, is specialized in hall acoustics design, noise and vibration control design, and acoustics testing. It has joined hands with domestic acoustic authorities and acoustic experts to provide overall solutions and services for acoustic environment in gymnasiums, multi-function halls, theaters, concert halls, cinemas, auditoriums, classrooms and other places.

— Related Case —